BIM model at construction-drawing stage, LOD 350 and 400. Included 3D design coordination, quantity take-off, project management through BIM, and BIM–GIS integration.
TEACHING STAFF
Leads the technical infrastructure BIM Manager course at the Institute. A bridge and road engineer, supporting member of the National BIM Steering Committee and a contributor to the national BIM Guidelines.
FIELD OF WORK
A BIM specialist in technical infrastructure: bridges, roads, seaports and water-control structures.
SELECTED PROJECTS
Each is a different class of structure, so the modelling approach and level of detail differ from one to the next.
BIM model at construction-drawing stage, LOD 350 and 400. Included 3D design coordination, quantity take-off, project management through BIM, and BIM–GIS integration.
BIM model at construction-drawing stage, LOD 300 and 350, with 3D design coordination, quantity take-off, plus training and handover to the client.
BIM package for the Song Len headworks dam and the salinity barriers on De canal and Can river — Class II structures. Client: the Central Project Office for water resources.
World Bank funded. Building information models for three pumping stations: Kim Xa, Ngu Kien and Nguyet Duc.
Building information model for the coal receiving berth, 18,000 tonne vessels, 190 metres of quay.
A BIM pilot project. BIM coordination for the construction-drawing and method-statement models, with 4D schedule simulation.
EDUCATION
TOOLS
BRIDGE DESIGN
Before the BIM work came two decades as project and lead designer on bridges.
Bridges, roads, ports and water structures apply BIM in their own way, quite unlike tall buildings.