News & insights

Construction industry knowledge

Articles written by the lecturers and practising engineers of the Institute: cost estimating, BIM, Revit, structures, scheduling and careers — for working engineers and students.

  • 328 articles
  • 14 categories
  • Updated 22 Oct 2026

Revit

Understanding Revit Trim/Extend

Revit trim/extend in Revit 2027: Trim/Extend to Corner (TR), Single Element, Multiple Elements; click the part to keep, join walls, pipes get an elbow.

· 4 min read

Revit

Revit 3D View: 4 Ways to Orbit the Model

The Revit 3D view in Revit 2027: orbit with Shift and the middle button, ViewCube, the Orbit tool, pivot points, and fixes for a 3D view not showing.

· 10 min read

Revit

Free Revit Add-ins Worth Installing

Free Revit add-ins worth installing: pyRevit, DiRootsOne, Naviate Discover, RevitLookup — what each does, how to install, disable and remove them.

· 7 min read

Revit Structure

Strip Footing Family in Revit

Strip footing family in Revit 2027: build an inverted T section, add size and material parameters, give each run its own length, compare Wall Foundation.

· 15 min read

Revit Structure

Isolated Footing Family in Revit

Build an isolated footing family in Revit 2027 from Metric Structural Foundation: EQ-locked planes, size, depth and material, then place it under columns.

· 14 min read

AutoCAD – Drawings

The RE command in AutoCAD: what a regen costs

The RE command in AutoCAD regenerates everything in the viewport. On AutoCAD 2027 - how long RE takes, how it differs from REDRAW, and when to skip it.

· 8 min read

Revit Architecture

Curtain wall in Revit: grids, mullions and panels

Draw a curtain wall in Revit with the Wall tool, divide it with the five Layout options, place mullions on the grid lines and choose what fills each panel.

· 13 min read